View and manage all work reports
| Employee | Date | Company | Travel Time | Tasks | Custom Task | Materials | Notes | Total Time on Site | Actions |
|---|---|---|---|---|---|---|---|---|---|
| Conor O'Brien | 2026-03-06 | CoolServ Ltd |
To site (07:30 - 08:12) (0h 42min) Return (16:15 - 16:58) (0h 43min) |
Leak Detection (08:12 - 09:50) (1h 38min) Refrigerant Recharge (09:50 - 11:30) (1h 40min) Pressure Check (13:00 - 14:15) (1h 15min) |
- |
R410A (1.4 kg) Leak Detection Foam (1 pcs.) Sealant (1 pcs.) |
Leak found at valve connection on the 2nd floor. Repaired, system recharged. Pressure stable. | 5h 58min | |
| Sean Kelly | 2026-03-09 | ClimaMax Ltd |
To site (07:00 - 07:55) (0h 55min) Return (15:00 - 15:56) (0h 56min) |
Air Conditioner Service (07:55 - 10:30) (2h 35min) Equipment Cleaning (10:30 - 12:00) (1h 30min) Visual Inspection (13:00 - 14:30) (1h 30min) |
- |
Service Kit (1 pcs.) Filter G4 (1 pcs.) |
Scheduled preventive maintenance. All units operating within specification. Client informed of filter wear — replacement recommended in 1 month. | 7h 26min | |
| Fionn Walsh | 2026-03-10 | Air Comfort Ltd |
To site (08:30 - 09:03) (0h 33min) Return (15:30 - 16:04) (0h 34min) |
Pressure Sensor Replacement (09:03 - 10:45) (1h 42min) Controller Configuration (10:45 - 12:00) (1h 15min) |
- |
HP Pressure Sensor (2 pcs.) |
Both high pressure sensors replaced — showing incorrect readings. Controller reprogrammed. System tested and handed over. | 4h 4min |