Employee Date Company Travel Time Tasks Custom Task Materials Notes Total Time on Site Actions
Conor O'Brien 2026-03-06 CoolServ Ltd To site (07:30 - 08:12) (0h 42min)
Return (16:15 - 16:58) (0h 43min)
Leak Detection (08:12 - 09:50) (1h 38min)
Refrigerant Recharge (09:50 - 11:30) (1h 40min)
Pressure Check (13:00 - 14:15) (1h 15min)
- R410A (1.4 kg)
Leak Detection Foam (1 pcs.)
Sealant (1 pcs.)
Leak found at valve connection on the 2nd floor. Repaired, system recharged. Pressure stable. 5h 58min
Sean Kelly 2026-03-09 ClimaMax Ltd To site (07:00 - 07:55) (0h 55min)
Return (15:00 - 15:56) (0h 56min)
Air Conditioner Service (07:55 - 10:30) (2h 35min)
Equipment Cleaning (10:30 - 12:00) (1h 30min)
Visual Inspection (13:00 - 14:30) (1h 30min)
- Service Kit (1 pcs.)
Filter G4 (1 pcs.)
Scheduled preventive maintenance. All units operating within specification. Client informed of filter wear — replacement recommended in 1 month. 7h 26min
Fionn Walsh 2026-03-10 Air Comfort Ltd To site (08:30 - 09:03) (0h 33min)
Return (15:30 - 16:04) (0h 34min)
Pressure Sensor Replacement (09:03 - 10:45) (1h 42min)
Controller Configuration (10:45 - 12:00) (1h 15min)
- HP Pressure Sensor (2 pcs.)
Both high pressure sensors replaced — showing incorrect readings. Controller reprogrammed. System tested and handed over. 4h 4min